The Yellow Line of Namma Metro has officially transformed Bengaluru's connectivity in 2025. Linking the bustling tech corridors of Electronic City to the heart of the city at RV Road, this fully elevated 18.8 km corridor is a game-changer for commuters, cutting travel times and reducing traffic congestion on one of Bengaluru's busiest stretches.
Whether you're a daily commuter, a tech professional, or a visitor, here's everything you need to know about the Yellow Line in 2025 – from stations and timings to future expansion plans.
Overview of the Yellow Line Metro in Bengaluru
- Route Length: ~18.8 km (fully elevated)
- Start Point: Rashtreeya Vidyalaya Road (RV Road)
- End Point: Delta Electronics Bommasandra (Bommasandra)
- Travel Time (End-to-End): 31-38 minutes
- Inauguration: 10 August 2025 by Prime Minister Narendra Modi
- Commercial Operations: Started 11 August 2025
- Project Cost: ₹7,160–₹7,610 crore (sources vary)
- Daily Ridership Target: 8 lakh passengers
Yellow Line Route Map and Complete Station List
The Yellow Line runs through key industrial and tech hubs, offering seamless connectivity to the Green, Pink, and upcoming Blue metro lines.
List of Stations (North to South):
- RV Road (Interchange with Green Line)
- Jayadeva Hospital (Future interchange with Pink Line)
- Central Silk Board (Future interchange with Blue Line)
- Infosys Foundation Konappana Agrahara
- Delta Electronics Bommasandra
Daily Timings, First & Last Train Schedule
- Last Train from Bommasandra: ~10:42 PM
- Last Train from RV Road: ~11:55 PM
- Initial phase: Every 25 minutes (three driverless trainsets)
- Expected improvement: 5-8 minutes during peak hours once all 15 trainsets are operational
Interchange Stations & Connectivity to Other Lines
- RV Road: Direct Green Line access to Majestic, Yeshwanthpur, Nagasandra.
- Jayadeva Hospital: Will connect to the Pink Line for Bannerghatta Road commuters.
- Central Silk Board: Will become a major interchange with the Blue Line towards Kempegowda International Airport.
Why the Yellow Line Matters
- Tech Corridor Boost: Direct metro link to Electronic City, home to Infosys, Wipro, Biocon, and hundreds of IT/ITES firms.
- Traffic Decongestion: Reduces dependency on Hosur Road, notorious for peak-hour gridlock.
- Eco-Friendly Travel: Driverless trains and reduced vehicle emissions support Bengaluru's sustainability goals.
- Cost-Effective: Lower daily commute costs compared to fuel and ride-hailing services.
Future Extensions: Bommasandra to Hosur
A Bommasandra–Hosur extension is under planning, expected to connect Bengaluru to Tamil Nadu's industrial hub in Hosur. This would make the Yellow Line an interstate commuter lifeline, pending DPR approvals by the Tamil Nadu government.
Travel Tips for Yellow Line Passengers
- Use Smart Cards or QR Tickets to avoid queues.
- Plan Interchanges: If traveling to Majestic, change at RV Road (Green Line).
- Peak Hours: Morning rush (8–10 AM) and evening rush (5:30–8 PM) are busiest.
- First/Last Train Awareness: Essential for late-night return trips.
Conclusion
The Yellow Line Metro marks a milestone in Bengaluru's public transport journey, promising faster, cleaner, and more reliable connectivity between residential neighbourhoods, IT hubs, and commercial centres. With future expansions in sight, it's set to play a pivotal role in shaping the city's urban mobility for decades to come.